Home Artists Posts Import Register

Downloads

Content

In the world of construction, we call this "topping out" - these files represent the last of the major floor/roof components. Here are a few important notes:

  • Like with the other floors, having some super glue and binder clips handy will make your assembly of the floor modules much easier.
  • This is also an opportunity to add in the iconic firehouse 'pole'. This element is the only part of this project this is not 3D printable. I visited my hardware store and spec'd a round brass rod with ~1/4" diameter. As it happened, the actual dimensions came to about 3.5 mm. I included two sized adapters for 3.5mm and 4mm.

After this - we'll be getting into some smaller components - look forward to an Ecto-2 helipad, garage door, railings, stairs, and more!

The brass rod looks niiiiice when it is installed... and yes I have a concept for how the figures can slide down :)


Files

Comments

Dave Ciszewski

I'm also confused about the columns. We're these the same size as the 8 below ? I have the random 2 columns that are a different height.

Nate Miller

Yes - 2 columns (B) are longer than the others. This is because they should connected directly to the Level 2 columns below it near the front facade.

Chris Franks

where do u get the pole at?

Nate Miller

It’s a brass rod I found at the hardware store. A little smaller than 1/4” diameter